Refer to procedure for specific items required for particular circumstance The PDU provides the transition from the large cables that run from the office power board to the smaller cables that provide power to the shelf assemblies. Office power is connected to the (PDU) which in turn connects to the backplane of the shelf assembly. The 9500 MPR radio operates on -48 Vdc input power. Publication date Usage Public Domain Mark 1.0 Topics Ringtone Archives. PrerequisiteĮstablish equipment or station ground in accordance with your company grounding requirements for all installations. This procedure provides instructions to route and connect the station ground cable to a standard or seismic rack, and to route and connect office battery power to the Power Distribution Unit (PDU). See Figure 1-1 and Figure 2-2.īack to Top Ground and Battery Cabling Purpose Mount the PDU in the desired spot using four rack screws. No rack or shelf alarms are provided on the fuse panel. A front panel alarm LED is provided to indicate a blown fuse. Press Power + Volume Up button for Recovery Menu. Double Click Nokia 2.3 Hard Reset Tool.Bat File Afterward Phone Reboot into Recovery Mode and Wait Until Recovery Logo. #Nokia Webeml Download download#Download Nokia 2.3 Hard Reset Tool File in the Above. An optional relay card is available that provides eight Form-C relay outputs for radio major and minor alarms. Place Phone on Fastboot Mode Utilizing Volume Down + Power Button and Add USB Cable. Battery input voltage can be 0.5 to 60 Vdc. The fuse panel provides fuses for up to four 9500 MPR shelves (sixteen 20 Amp fuses two A and B + and two A and B - per shelf) and two AUX shelves (eight 10 Amp fuses). One increment above the PDU is required for heat dissipation. Mounting the PDU requires three rack increments.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |